Consolidation

 

Peaty, clayey and sometimes even silty soils are characterized by a high-water content, very low permeability and a low strength. When loads are applied to these soils, excess pore water pressure develops as the soil cannot adjust to the new load due to the very low permeability and slow dissipation of the excess pore water. With the dissipation of the excess pore pressures the soil adjusts to the new load. This often results in long periods (years) with high consolidation settlements and a low to insufficient safety factor on the stability of the embankment. With the application of low cost prefabricated vertical drains (PVD) a considerable reduction of the consolidation / settlement time, from years to months, and a major improvement in the stability of the embankment can be achieved. When surcharge is used, residual settlements can be controlled. The use of PVD with surcharge is therefore one of the most commonly used techniques and often the cheapest method to prepare soft compressible subsoil for future construction activities. Cofra has several consolidation systems within its portfolio. Find out more by using the links in the overview below. 

Website Diagram Consolidation Wide
Csm IMG 7687 557Acf3c3b

Our solutions

Cofra has the following consolidation solutions within it's portfolio

Offshore vertical drain installation

A selection of our consolidation projects

Selected filters
IMG1263

PVD installation for landing strip Malaga airport

With an installation depth up to 30m, we installed in 2009, 2,000,000m1 of prefabricated vertical drain.

P1020271

PVD installation for road embankment Paramaribo

In 2009, we installed a prefabricated vertical drain of 300,000m1 with an installation depth up to 20m.

P1080758

PVD installation for new Istanbul Airport project

With an installation depth up to 17m, we installed in 2015, 575,000m1 of prefabricated vertical drain.

P1020271

PVD installation for Bombay port India

 We installed 2,000,000m1 of prefabricated vertical drain in 1986 on this project.

P1020271

PVD installation for channel tunnel

We installed 2,200,000m1 of prefabricated vertical drain in 1998 on this project.

P1020271

PVD delivery for Osaka Airport

Cofra and Geotechnics have delivered 1,200,000m1 PVD for the Osaka aiport expansion project in 1992.