Peaty, clayey and sometimes even silty soils are characterized by a high-water content, very low permeability and a low strength. When loads are applied to these soils, excess pore water pressure develops as the soil cannot adjust to the new load due to the very low permeability and slow dissipation of the excess pore water. With the dissipation of the excess pore pressures the soil adjusts to the new load. This often results in long periods (years) with high consolidation settlements and a low to insufficient safety factor on the stability of the embankment. With the application of low cost prefabricated vertical drains (PVD) a considerable reduction of the consolidation / settlement time, from years to months, and a major improvement in the stability of the embankment can be achieved. When surcharge is used, residual settlements can be controlled. The use of PVD with surcharge is therefore one of the most commonly used techniques and often the cheapest method to prepare soft compressible subsoil for future construction activities. Cofra has several consolidation systems within its portfolio. Find out more by using the links in the overview below. 

Website Diagram Consolidation Wide
Csm IMG 7687 557Acf3c3b

Our solutions

Cofra has the following consolidation solutions within it's portfolio

Offshore vertical drain installation

A selection of our consolidation projects

Selected filters
P1070065

Vacuum consolidation for Eastern Access Route IJburg (OOIJ), Amsterdam

We installed our BeauDrain and BeauDrain-S vacuum consolidation methods on an area of 50,000m2 up to a depth of 7,0m in 2012 on this project.

P1060456

Vacuum consolidation trial Tuas view A3A, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 5,000m2 up to a depth of 24m in 2010 on this project to investigate the depth effect of the vacuum system.

International_cruise_terminal_singapore_7

Vacuum consolidation for the international cruise terminal, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 6,000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles.

Markermeerdijken_6

Vacuum consolidation trial Markermeerdijken

We installed our BeauDrain-S vacuum consolidation method and Liner vacuum method on an area of 450m2 up to a depth of 7m in 2016.

IMG_3909

PVD installation for Treasure Island, San Francisco

Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands.

IMG_0883

BeauDrain-S installation for dike reinforcement project Hoekse Waard Noord

We installed BeauDrain-S drains without vacuum preloading for draining a specific layer for a dike reinforcement project in the Netherlands.