Peaty, clayey and sometimes even silty soils are characterized by a high-water content, very low permeability and a low strength. When loads are applied to these soils, excess pore water pressure develops as the soil cannot adjust to the new load due to the very low permeability and slow dissipation of the excess pore water. With the dissipation of the excess pore pressures the soil adjusts to the new load. This often results in long periods (years) with high consolidation settlements and a low to insufficient safety factor on the stability of the embankment. With the application of low cost prefabricated vertical drains (PVD) a considerable reduction of the consolidation / settlement time, from years to months, and a major improvement in the stability of the embankment can be achieved. When surcharge is used, residual settlements can be controlled. The use of PVD with surcharge is therefore one of the most commonly used techniques and often the cheapest method to prepare soft compressible subsoil for future construction activities. Cofra has several consolidation systems within its portfolio. Find out more by using the links in the overview below. 

Website Diagram Consolidation Wide
Csm IMG 7687 557Acf3c3b

Our solutions

Cofra has the following consolidation solutions within it's portfolio

Offshore vertical drain installation

A selection of our consolidation projects

Selected filters
P1020271

PVD installation for housing development Frankfield Loch

Cofra Ltd has installed 42,000m1 of vertical drains for a housing development in 2014. In this particular case, special predrilling equipment was required to penetrate dense coarse layers on top of soft clay deposits.

P1020271

PVD installation for road embankments of Gort - Tuam connection

Cofra Ltd installed 700,000m1 of vertical drains for the Gort Tuam road embankments in 2015.

Littleport_7

PVD installation for Littleport school

Cofra Ltd installed 162,000m1 for the consolidation of the area around the Littleport school in 2015.

P1020271

PVD installation for a road embankment in Ince Marshes

Cofra Ltd installed 40,000m1 of vertical drain for the consolidation beneath a road embankment in 2016.

P1020271

PVD installation for Perth A9 A85 Junction

Cofra Ltd installed 363,000m1 of vertical drains on the new junction of the A9 and A85 in 2016.

P1020271

PVD installation for Dalton lane, Thirsk

Cofra Ltd installed 65,000m1 of vertical drains for the Dalton Lane in 2017.