Cofra Ltd installed 162,000m1 for the consolidation of the area around the Littleport school in 2015.
PVD installation is part of our segment consolidation.
Cofra Ltd installed 162,000m1 for the consolidation of the area around the Littleport school in 2015.
PVD installation is part of our segment consolidation.