Consolidation

 

Peaty, clayey and sometimes even silty soils are characterized by a high-water content, very low permeability and a low strength. When loads are applied to these soils, excess pore water pressure develops as the soil cannot adjust to the new load due to the very low permeability and slow dissipation of the excess pore water. With the dissipation of the excess pore pressures the soil adjusts to the new load. This often results in long periods (years) with high consolidation settlements and a low to insufficient safety factor on the stability of the embankment. With the application of low cost prefabricated vertical drains (PVD) a considerable reduction of the consolidation / settlement time, from years to months, and a major improvement in the stability of the embankment can be achieved. When surcharge is used, residual settlements can be controlled. The use of PVD with surcharge is therefore one of the most commonly used techniques and often the cheapest method to prepare soft compressible subsoil for future construction activities. Cofra has several consolidation systems within its portfolio. Find out more by using the links in the overview below. 

Website Diagram Consolidation Wide
Csm IMG 7687 557Acf3c3b

Our solutions

Cofra has the following consolidation solutions within it's portfolio

Offshore vertical drain installation

A selection of our consolidation projects

Selected filters
IMG_0974

PVD installation for PSA terminal expansion in Panama

In 2015, we installed 1,400,000m1 of prefabricated vertical drain, with an installation depth up to 12m.

IMG-20140605-WA005

PVD installation for Ostrow Brdowski island

In 2013, we installed 185,000m1 of prefabricated vertical drain, with an installation depth up to 11m.

DSC01840

PVD installation for auto-estrada do Norte

In 2011, we installed 1,500,000m1 of prefabricated vertical drain, with an installation depth up to 29m.

IMG_0058

PVD installation for world cup stadium St. Petersburg

 In 2016, we installed 1,800,000m1 of prefabricated vertical drain, with an installation depth up to 18m.

IMG_0027

PVD installation for world cup stadium Kaliningrad

In 2009, we installed 2,500,000m1 of prefabricated vertical drain, with an installation depth up to 18m.

IMG_0673

PVD installation for port of Barcelona

In 2010, we installed a prefabricated vertical drain of 900,000m1, with an installation depth up to 30m.