Consolidation

 

Peaty, clayey and sometimes even silty soils are characterized by a high-water content, very low permeability and a low strength. When loads are applied to these soils, excess pore water pressure develops as the soil cannot adjust to the new load due to the very low permeability and slow dissipation of the excess pore water. With the dissipation of the excess pore pressures the soil adjusts to the new load. This often results in long periods (years) with high consolidation settlements and a low to insufficient safety factor on the stability of the embankment. With the application of low cost prefabricated vertical drains (PVD) a considerable reduction of the consolidation / settlement time, from years to months, and a major improvement in the stability of the embankment can be achieved. When surcharge is used, residual settlements can be controlled. The use of PVD with surcharge is therefore one of the most commonly used techniques and often the cheapest method to prepare soft compressible subsoil for future construction activities. Cofra has several consolidation systems within its portfolio. Find out more by using the links in the overview below. 

Website Diagram Consolidation Wide
Csm IMG 7687 557Acf3c3b

Our solutions

Cofra has the following consolidation solutions within it's portfolio

Offshore vertical drain installation

A selection of our consolidation projects

Selected filters
P1020271

PVD installation for ENEL powerplant Porto Tolle

In 2003, we installed 700,000m1 of prefabricated vertical drain, with an installation depth up to 25m.

Kingston_013

PVD installation for Falmouth Cruise terminal

In 2010, we installed 50,000m1 of prefabricated vertical drain, with an installation depth up to 9,5m.

DSC_2939

PVD installation for Mombasa port expansion

In 2013, we installed 5,000,000m1 of prefabricated vertical drain, with an installation depth up to 32m. In 2019, a second phase was executed with 3.300.000m1 of drain.

DAN_3886

Offshore PVD installation for Quay 16 extension, Beirut

In 2011, we installed 190,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 52m.

P1020271

PVD installation for several projects in Tanjung Pelepas port

Between 2002 and 2003, Cofra Singapore installed 113,000,000m1 of prefabricated vertical drain, with an installation depth up to 34m, on three projects in this port.

Overview02

PVD installation for Autoroute Tetouan-Fnideq

In 2004, we installed 1,300,000m1 of prefabricated vertical drain, with an installation depth up to 33m.