To main content

PVD installation for landing strip Malaga airport

With an installation depth up to 30m, we installed in 2009, 2,000,000m1 of prefabricated vertical drain.

PVD installation is part of our segment consolidation

Related projects

IMG_3400

PVD installation airport construction Changi East, Singapore

We have installed, 42,000,000m1 of prefabricated vertical drains, with an installation depth up to 60m.

DJI_0082

PVD installation Matarbari USCC Power Plant Project, Bangladesh

In 2018 and 2019, we installed over 10,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m.

Makassar_13

PVD installation for reclamation Centerpoint Makassar

In 2017, we installed 7,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m.

IMG_8232

PVD installation new Mexico City airport runway 3

In 2017, we installed 27,800,000m1 of prefabricated vertical drains, with an installation depth up to 20m.

bouyguesTP-PortBrest-M02-P1-2515_original

Offshore PVD installation M02 basin enclosure Port de Brest, France

In 2018, we installed 415,000m1 of prefabricated vertical drains from a barge, with an installation depth up to 17 below seabed. 

DSC_1084

PVD installation N23 provincial road widening the Netherlands

Between 2015-2016, we installed 11,300,000m1 of prefabricated vertical drains, with an installation depth up to 12m.