PVD installation Tuas Finger One reclamation, Singapore

Between 2016 and 2019, we installed 5,800,000m1 of prefabricated vertical drains, with an installation depth up to 35m.

PVD installation is part of our segment consolidation.

Related projects

IMG_9645

PVD installation through very dense sand layer Chek Lap Kok Link, Hong Kong

In 2016, Cofra Singapore installed 1,600,000m1 drain up to a depth of 45m using our heavy push rig, pushing through the dense sand layer at 20m of depth without predrilling.

20140917_120602

PVD installation highway widening SAAone A1/A6 Diemen - Almere

In 2016, we installed 7,500,000m1 of prefabricated vertical drains, with an installation depth up to 7m.

West_Hythe_7

PVD installation for housing estate West Hythe phase 1-6, UK

Between 2016 and 2019, Cofra Ltd installed around 400.000 m1 of prefabricated vertical drains, each year.

Swindon_G_Park_8

PVD installation for Distribution Plot, Swindon

In 2018, Cofra ltd installed 205,000m1 of prefabricated vertical drains.

Tuas1

PVD installation Tuas Finger One reclamation, Singapore

Between 2016 and 2019, we installed 5,800,000m1 of prefabricated vertical drains, with an installation depth up to 35m.

Pic_014

PVD installation LNG plant Soyo reclamation

In 2008, we installed 2,300,000m1 of prefabricated vertical drains, with an installation depth up to 25m.