Geolock installation to prevent contamination spread around a factory in Kokkola, Finland

We installed 12,000m2 of Geolock, a vertical impermeable 2mm HDPE seal, up to a depth of 9m to assure watertightness and prevent the spread of contamination around the waste area of a factory in Kokkola, Finland, in 2006-2007.

Geolock installation is part of our segment barriers.

Related projects

IMG-20180619-WA0006

Liner installation for Incinerated ashes depot for N62 road, The Netherlands

We have installed 90,000m2 of liner to cover incinerated ashes embankments in 2019 on the N62.

DSC_1806

Liner installation for upgrade A27 highway

We have installed 220,000m2 of liner to upgrade an old incinerated ashes embankment in 2015.

DSC_0016

Liner installation for incinerated ashes embankment A9 highway

We have installed 220,000m2 of liner to cover incinerated ashes embankments on the new A9 deviation around Badhoevedorp in 2019.

DSC_0405

Liner installation for large incinerated ashed depot in harbour of Amsterdam.

We have installed 130,000m2 of liner to cover an incinerated ashes depot in operation between 2013 and 2018.

P1020678__2_

Liner installation for landfill site Veendam

We have installed 288,000m2 of HDPE 2mm liner to cover a landfill in 2012.

Volgermeer_luchtfoto-01__13_

Liner installation former dumpsite Volgermeerpolder

We have installed 850.000m2 of HDPE 2mm liner to cover an old highly poluted landfill site between 2006 and 2010.