We have installed 130,000m2 of liner to cover an incinerated ashes depot in operation between 2013 and 2018.
Liner installation is part of our segment barriers
We have installed 130,000m2 of liner to cover an incinerated ashes depot in operation between 2013 and 2018.
Liner installation is part of our segment barriers