In 2016, Cofra Singapore installed 1,600,000m1 drain up to a depth of 45m using our heavy push rig, pushing through the dense sand layer at 20m of depth without predrilling.
PVDÂ installation is part of our segment consolidation.
In 2016, Cofra Singapore installed 1,600,000m1 drain up to a depth of 45m using our heavy push rig, pushing through the dense sand layer at 20m of depth without predrilling.
PVDÂ installation is part of our segment consolidation.