In 2013, we installed 185,000m1 of prefabricated vertical drain, with an installation depth up to 11m. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet PVD installation for landing strip Malaga airport With an installation depth up to 30m, we installed in 2009, 2,000,000m1 of prefabricated vertical drain. Read more PVD installation for road embankment Paramaribo In 2009, we installed a prefabricated vertical drain of 300,000m1 with an installation depth up to 20m. Read more PVD installation for new Istanbul Airport project With an installation depth up to 17m, we installed in 2015, 575,000m1 of prefabricated vertical drain. Read more PVD installation for Bombay port India We installed 2,000,000m1 of prefabricated vertical drain in 1986 on this project. Read more PVD installation for channel tunnel We installed 2,200,000m1 of prefabricated vertical drain in 1998 on this project. Read more PVD delivery for Osaka Airport Cofra and Geotechnics have delivered 1,200,000m1 PVD for the Osaka aiport expansion project in 1992. Read more Previous 6 7 8 9 10 Next Read more Read more