To main content

Offshore PVD installation M02 basin enclosure Port de Brest, France

In 2018, we installed 415,000m1 of prefabricated vertical drains from a barge, with an installation depth up to 17 below seabed. 

PVD installation is part of our segment consolidation.

Related projects

P1020271

PVD installation for A6 Randalstown diversion, UK

Cofra Ltd installed 450,000m1 for this road embankment in 2018.

P1020271

PVD installation for Newton farm housing development, UK

Cofra Ltd installed 126,000m1 of vertical drains for this housing development in 2018.

P1020271

PVD installation for Doncaster iPort warehouse development, UK

Cofra Ltd installed 257,000m1 of vertical drains for the development of a new warehouse in Doncaster in 2018.

P1020271

PVD installation for housing development Centenary Quay, UK

Cofra Ltd installed 35,000m1 for this housing development in 2018.

PHOTO-2018-04-08-17-58-59

PVD for tailing pond remediation, France

Cofra has installed vertical drains for the remediation of a tailing pond in 2019.