Cofra Ltd installed 257,000m1 of vertical drains for the development of a new warehouse in Doncaster in 2018.
PVD installation is part of our segment consolidation.
Cofra Ltd installed 257,000m1 of vertical drains for the development of a new warehouse in Doncaster in 2018.
PVD installation is part of our segment consolidation.