Vacuum consolidation for the international cruise terminal, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 6,000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles.

Vacuum consolidation is part of our segment consolidation.

Related projects

P1020271

PVD installation for ENEL powerplant Porto Tolle

In 2003, we installed 700,000m1 of prefabricated vertical drain, with an installation depth up to 25m.

Kingston_013

PVD installation for Falmouth Cruise terminal

In 2010, we installed 50,000m1 of prefabricated vertical drain, with an installation depth up to 9,5m.

DSC_2939

PVD installation for Mombasa port expansion

In 2013, we installed 5,000,000m1 of prefabricated vertical drain, with an installation depth up to 32m. In 2019, a second phase was executed with 3.300.000m1 of drain.

DAN_3886

Offshore PVD installation for Quay 16 extension, Beirut

In 2011, we installed 190,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 52m.

P1020271

PVD installation for several projects in Tanjung Pelepas port

Between 2002 and 2003, Cofra Singapore installed 113,000,000m1 of prefabricated vertical drain, with an installation depth up to 34m, on three projects in this port.

Overview02

PVD installation for Autoroute Tetouan-Fnideq

In 2004, we installed 1,300,000m1 of prefabricated vertical drain, with an installation depth up to 33m.