Vacuum consolidation for the international cruise terminal, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 6,000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles.

Vacuum consolidation is part of our segment consolidation.

Related projects

IMG_0974

PVD installation for PSA terminal expansion in Panama

In 2015, we installed 1,400,000m1 of prefabricated vertical drain, with an installation depth up to 12m.

IMG-20140605-WA005

PVD installation for Ostrow Brdowski island

In 2013, we installed 185,000m1 of prefabricated vertical drain, with an installation depth up to 11m.

DSC01840

PVD installation for auto-estrada do Norte

In 2011, we installed 1,500,000m1 of prefabricated vertical drain, with an installation depth up to 29m.

IMG_0058

PVD installation for world cup stadium St. Petersburg

 In 2016, we installed 1,800,000m1 of prefabricated vertical drain, with an installation depth up to 18m.

IMG_0027

PVD installation for world cup stadium Kaliningrad

In 2009, we installed 2,500,000m1 of prefabricated vertical drain, with an installation depth up to 18m.

IMG_0673

PVD installation for port of Barcelona

In 2010, we installed a prefabricated vertical drain of 900,000m1, with an installation depth up to 30m.