Vacuum consolidation for provincial road N207

We installed our BeauDrain-S vacuum consolidation on an area of 25,000m2 up to a depth of 9,0m in 2011.

Vacuum consolidation is part of our segment consolidation.

Related projects

IMG_3400

PVD installation airport construction Changi East, Singapore

We have installed, 42,000,000m1 of prefabricated vertical drains, with an installation depth up to 60m.

DJI_0082

PVD installation Matarbari USCC Power Plant Project, Bangladesh

In 2018 and 2019, we installed over 10,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m.

Makassar_13

PVD installation for reclamation Centerpoint Makassar

In 2017, we installed 7,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m.

IMG_8232

PVD installation new Mexico City airport runway 3

In 2017, we installed 27,800,000m1 of prefabricated vertical drains, with an installation depth up to 20m.

bouyguesTP-PortBrest-M02-P1-2515_original

Offshore PVD installation M02 basin enclosure Port de Brest, France

In 2018, we installed 415,000m1 of prefabricated vertical drains from a barge, with an installation depth up to 17 below seabed. 

DSC_1084

PVD installation N23 provincial road widening the Netherlands

Between 2015-2016, we installed 11,300,000m1 of prefabricated vertical drains, with an installation depth up to 12m.