Cofra Ltd installed 35,000m1 for this housing development in 2018. PVDÂ installation is part of our segment consolidation. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet Vacuum consolidation for Eastern Access Route IJburg (OOIJ), Amsterdam We installed our BeauDrain and BeauDrain-S vacuum consolidation methods on an area of 50,000m2 up to a depth of 7,0m in 2012 on this project. Read more Vacuum consolidation trial Tuas view A3A, Singapore We installed our BeauDrain-S vacuum consolidation method on an area of 5,000m2 up to a depth of 24m in 2010 on this project to investigate the depth effect of the vacuum system. Read more Vacuum consolidation for the international cruise terminal, Singapore We installed our BeauDrain-S vacuum consolidation method on an area of 6,000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles. Read more Vacuum consolidation trial Markermeerdijken We installed our BeauDrain-S vacuum consolidation method and Liner vacuum method on an area of 450m2 up to a depth of 7m in 2016. Read more PVD installation for Treasure Island, San Francisco Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands. Read more BeauDrain-S installation for dike reinforcement project Hoekse Waard Noord We installed BeauDrain-S drains without vacuum preloading for draining a specific layer for a dike reinforcement project in the Netherlands. Read more Previous 8 9 10 11 12 Next Read more Read more