Cofra Ltd installed 35,000m1 for this housing development in 2018. PVD installation is part of our segment consolidation. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet PVD installation airport construction Changi East, Singapore We have installed, 42,000,000m1 of prefabricated vertical drains, with an installation depth up to 60m. Read more PVD installation Matarbari USCC Power Plant Project, Bangladesh In 2018 and 2019, we installed over 10,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m. Read more PVD installation for reclamation Centerpoint Makassar In 2017, we installed 7,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m. Read more PVD installation new Mexico City airport runway 3 In 2017, we installed 27,800,000m1 of prefabricated vertical drains, with an installation depth up to 20m. Read more Offshore PVD installation M02 basin enclosure Port de Brest, France In 2018, we installed 415,000m1 of prefabricated vertical drains from a barge, with an installation depth up to 17 below seabed. Read more PVD installation N23 provincial road widening the Netherlands Between 2015-2016, we installed 11,300,000m1 of prefabricated vertical drains, with an installation depth up to 12m. Read more 1 2 3 Next Read more Read more