To main content

PVD installation for Falmouth Cruise terminal

In 2010, we installed 50,000m1 of prefabricated vertical drain, with an installation depth up to 9,5m.

PVD installation is part of our segment consolidation.

Related projects

P1020271

PVD installation for M74 Glasgow

Cofra Ltd installed 91,000m1 of vertical drain on this motorway embankment construction works in 2009.

P1020271

PVD installation for Road embankment, Rushenden

Cofra Ltd installed 177,000m1 of vertical drain on this Relief Road project in 2009.

P1020271

PVD installation for Belfast Docks, Northern Ireland

Cofra Ltd installed 200,000m1 of vertical drain on this new dock extension/development works in 2011.

P1020271

PVD installation for Daventry Rail freight Terminal

Cofra Ltd installed 155,000m1 of vertical drain on this rail embankment and high bay storage area in 2013.

P1020271

PVD installation for Mablethorpe housing development site

Cofra Ltd installed 800,000m1 of vertical drain on this housing development site in 2013.

P1020271

PVD installation for M9 Kilcullen motorway embankment

Cofra Ltd installed 38,000m1 of vertical drain on this motorway embankment construction works in 2014.