To main content

Offshore PVD installation for Gilhusbukta reclamation Drammen, Norway

In 2018, we installed 650,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 48m.

PVD installation is part of our segment consolidation.

Related projects

DSC02160

PVD installation Talinn Harbor extension

In 2004, we installed 500,000m1 of prefabricated vertical drain, with an installation depth up to 28m.

IMG_7687

PVD installation for Smince - Jaromer road

In 2018, Cofra Chemia installed 350,000m1 of prefabricated vertical drain, with an installation depth up to 15m.

P1020271

PVD delivery for DASA factory Hamburg

Cofra delivered 17,500,000m1 PVD on this project.

Afbeelding_002

Offshore PVD installation for a harbor in Kiel, Germany

In 2007, we installed 172,000m1 of prefabricated vertical drain in offshore conditions, with an installation depth up to 25m.

P1020271

PVD installation for Harbor extension Semsamar, Guadeloupe

in 2013, we installed 31,000m1 of prefabricated vertical drain, with an installation depth up to 19m.

P1020271

PVD installation for waste water treatment plant Conackry

In 2004, we installed 95,000m1 of prefabricated vertical drain, with an installation depth up to 11m.