To main content

Liner installation for upgrade A27 highway

We have installed 220,000m2 of liner to upgrade an old incinerated ashes embankment in 2015.

Liner installation is part of our segment barriers.

Related projects

DSCN0788

Geolock installation to prevent contamination spread around a factory in Kokkola, Finland

We installed 12,000m2 of Geolock, a vertical impermeable 2mm HDPE seal, up to a depth of 9m to assure watertightness and prevent the spread of contamination around the waste area of a factory in Kokkola, Finland, in 2006-2007.

DSCF0206

Geolock installation to prevent seapage of water in Escravos Nigeria

We installed 13.000m2 of Geolock, a vertical impermeable 2mm HDPE seal, up to adepth of 5.5m to assure watertightness around a gass plant in Escravos Nigeria in 2004