With an installation depth up to 11m, we installed in 2013, 185.000m1 of prefabricated vertical drain Gerelateerde projecten Filter projecten (76) Sorteer op... Relevantie Alfabet Sorteer op... Relevantie Alfabet PVD installation for ENEL powerplant Porto Tolle With an installation depth up to 25m, we installed in 2003, 700.000m1 of prefabricated vertical drain Lees meer PVD installation for Falmouth Cruise terminal With an installation depth up to 9.5m, we installed in 2010, 50.000m1 of prefabricated vertical drain Lees meer PVD installation for Mombasa port expansion With an installation depth up to 32m, we installed in 2013, 5.000.000m1 of prefabricated vertical drain. In 2019 a second phase was executed with 3.300.000m1 of drain Lees meer Offshore PVD installation for Quay 16 extension, Beirut With an installation depth up to 52m, we installed in 2011, 190.000m1 of prefabricated vertical drain from a barge Lees meer PVD installation for several projects in Tanjung Pelepas port With an installation depth up to 34m, cofra singapore installed between 2002 and 2003 on three proejcts in this port, 113.000.000m1 of prefabricated vertical drain Lees meer PVD installation for Autoroute Tetouan-Fnideq With an installation depth up to 33m, we installed in 2004, 1.300.000m1 of prefabricated vertical drain. Lees meer Vorige 3 4 5 6 7 Volgende Lees meer Lees meer