Direct naar hoofdinhoud

PVD installation for Mombasa port expansion

With an installation depth up to 32m, we installed in 2013, 5.000.000m1 of prefabricated vertical drain. In 2019 a second phase was executed with 3.300.000m1 of drain

PVD installation is part of our segment consolidation.