Direct naar hoofdinhoud

PVD installation for Mombasa port expansion

With an installation depth up to 32m, we installed in 2013, 5.000.000m1 of prefabricated vertical drain. In 2019 a second phase was executed with 3.300.000m1 of drain

PVD installation is part of our segment consolidation.

Gerelateerde projecten

P1020871

PVD installation for several phases of the expansion of Port of Brisbane

With an installation depth up to 38m, we installed in 2012 and 2006, 1.300.000m1 of prefabricated vertical drains

P1020271

PVD installation for an Highway embankment in Schenker Rothis

With an installation depth up to 25m, we installed in 2002, 150.000m1 of prefabricated vertical drains

IMG_7795

PVD installation Zone Portuaire de Pecq, Belgium

With an installation depth up to 15m, we installed in 2017, 300.000m1 of prefabricated vertical drains

STA41094

PVD installation railway embankment Brussels

With an installation depth up to 12m, we installed in 2006, 175.000m1 of prefabricated vertical drains

COFRA090608_BELOUGA42

PVD installation Port of St. Nazaire, France

With an installation depth up to 30m, we installed in 2007, 375.000m1 of prefabricated vertical drains.

P7230040

PVD installation Ikea Bayonne

With an installation depth up to 45m, we installed in 2013, 940.000m1 of prefabricated vertical drains