To main content

Vacuum consolidation trial Tuas view A3A, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 5,000m2 up to a depth of 24m in 2010 on this project to investigate the depth effect of the vacuum system.

Vacuum consolidation is part of our segment consolidation.

Related projects

P1020871

PVD installation for several phases of the expansion of Port of Brisbane

In 2012 and 2006, we installed 1,300,000m1 of prefabricated vertical drains, with an installation depth up to 38m.

P1020271

PVD installation for an Highway embankment in Schenker Rothis

In 2002, we installed 150,000m1 of prefabricated vertical drains, with an installation depth up to 25m.

IMG_7795

PVD installation Zone Portuaire de Pecq, Belgium

In 2017, we installed 300,000m1 of prefabricated vertical drains, with an installation depth up to 15m.

STA41094

PVD installation railway embankment Brussels

In 2006, we installed 175,000m1 of prefabricated vertical drains, with an installation depth up to 12m.

COFRA090608_BELOUGA42

PVD installation Port of St. Nazaire, France

In 2007, we installed 375,000m1 of prefabricated vertical drains, with an installation depth up to 30m.  

P7230040

PVD installation Ikea Bayonne

In 2013, we installed 940,000m1 of prefabricated vertical drains, with an installation depth up to 45m.