Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands.
PVD installation is part of our segment consolidation.
Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands.
PVD installation is part of our segment consolidation.