PVD installation for M74 Glasgow

Cofra Ltd installed 91,000m1 of vertical drain on this motorway embankment construction works in 2009.

PVD installation is part of our segment consolidation.

Related projects

P1020271

PVD installation for housing development Frankfield Loch

Cofra Ltd has installed 42,000m1 of vertical drains for a housing development in 2014. In this particular case, special predrilling equipment was required to penetrate dense coarse layers on top of soft clay deposits.

P1020271

PVD installation for road embankments of Gort - Tuam connection

Cofra Ltd installed 700,000m1 of vertical drains for the Gort Tuam road embankments in 2015.

Littleport_7

PVD installation for Littleport school

Cofra Ltd installed 162,000m1 for the consolidation of the area around the Littleport school in 2015.

P1020271

PVD installation for a road embankment in Ince Marshes

Cofra Ltd installed 40,000m1 of vertical drain for the consolidation beneath a road embankment in 2016.

P1020271

PVD installation for Perth A9 A85 Junction

Cofra Ltd installed 363,000m1 of vertical drains on the new junction of the A9 and A85 in 2016.

P1020271

PVD installation for Dalton lane, Thirsk

Cofra Ltd installed 65,000m1 of vertical drains for the Dalton Lane in 2017.