Cofra Ltd installed 450,000m1 for this road embankment in 2018. PVDÂ installation is part of our segment consolidation. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet PVD installation for ENEL powerplant Porto Tolle In 2003, we installed 700,000m1 of prefabricated vertical drain, with an installation depth up to 25m. Read more PVD installation for Falmouth Cruise terminal In 2010, we installed 50,000m1 of prefabricated vertical drain, with an installation depth up to 9,5m. Read more PVD installation for Mombasa port expansion In 2013, we installed 5,000,000m1 of prefabricated vertical drain, with an installation depth up to 32m. In 2019, a second phase was executed with 3.300.000m1 of drain. Read more Offshore PVD installation for Quay 16 extension, Beirut In 2011, we installed 190,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 52m. Read more PVD installation for several projects in Tanjung Pelepas port Between 2002 and 2003, Cofra Singapore installed 113,000,000m1 of prefabricated vertical drain, with an installation depth up to 34m, on three projects in this port. Read more PVD installation for Autoroute Tetouan-Fnideq In 2004, we installed 1,300,000m1 of prefabricated vertical drain, with an installation depth up to 33m. Read more Previous 3 4 5 6 7 Next Read more Read more