Cofra and Geotechnics have delivered 1,200,000m1 PVD for the Osaka aiport expansion project in 1992. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet PVD installation for several phases of the expansion of Port of Brisbane In 2012 and 2006, we installed 1,300,000m1 of prefabricated vertical drains, with an installation depth up to 38m. Read more PVD installation for an Highway embankment in Schenker Rothis In 2002, we installed 150,000m1 of prefabricated vertical drains, with an installation depth up to 25m. Read more PVD installation Zone Portuaire de Pecq, Belgium In 2017, we installed 300,000m1 of prefabricated vertical drains, with an installation depth up to 15m. Read more PVD installation railway embankment Brussels In 2006, we installed 175,000m1 of prefabricated vertical drains, with an installation depth up to 12m. Read more PVD installation Port of St. Nazaire, France In 2007, we installed 375,000m1 of prefabricated vertical drains, with an installation depth up to 30m. Read more PVD installation Ikea Bayonne In 2013, we installed 940,000m1 of prefabricated vertical drains, with an installation depth up to 45m. Read more Previous 1 2 3 4 5 Next Read more Read more