Direct naar hoofdinhoud

PVD installation Matarbari USCC Power Plant Project, Bangladesh

With an installation depth up to 25m, we installed in 2018 and 2019 over 10.000.000m1 of prefabricated vertical drains

PVD installation is part of our segment consolidation.

Gerelateerde projecten

P1060324

PVD installation for Westrandweg, Amsterdam

With an installation depth up to 14m, we installed in 2009, 1.300.000m1 of prefabricated vertical drain

FOTO_S_FRANS_VAN_GERVEN_046

PVD installation for widening of A2 highway, The Netherlands

With an installation depth up to 10m, we installed in 2003, 7.500.000m1 of prefabricated vertical drain

20150630_162721

PVD installation for Onne port container terminal

With an installation depth up to 30m, we installed in 2015, 1.400.000m1 of prefabricated vertical drain

IMGP2732

PVD installation for Brass LNG

With an installation depth up to 45m, we installed in 2008, 900.000m1 of prefabricated vertical drain

Drammen_1

Offshore PVD installation for Gilhusbukta reclamation Drammen, Norway

With an installation depth up to 48m, we installed in 2018, 650.000m1 of prefabricated vertical drain from a barge

DSC01104

Offshore PVD installation projects Oslo harbor

With an installation depth up to 30m, we installed PVD on several projects in Oslo harbour, amongst which the opera house. In 2006 a phase with in total 65.000m1 of prefabricated vertical drain installed from a barge was completed