Project
PVD installation airport construction Changi East, Singapore
PVD installation airport construction Changi East, Singapore With an installation depth up to 60m, we are installing, 42.000.000m1 of prefabricated vertical drains PVD installation is part of our segment consolidation. KTC Singapore Cofra B.V.