Direct naar hoofdinhoud

PVD installation Matarbari USCC Power Plant Project, Bangladesh

With an installation depth up to 25m, we installed in 2018 and 2019 over 10.000.000m1 of prefabricated vertical drains

PVD installation is part of our segment consolidation.

Gerelateerde projecten

P1020271

PVD installation for Newton farm housing development, UK

Cofra Ltd installed 126.000m1 of vertical drains for this housing development in 2018

P1020271

PVD installation for Doncaster iPort warehouse development, UK

Cofra Ltd installed 257.000m1 of vertical drains for the development of a new warehouse in Doncaster in 2018.

P1020271

PVD installation for housing development Centenary Quay, UK

Cofra Ltd installed 35.000m1 for this housing development in 2018.

PHOTO-2018-04-08-17-58-59

PVD for tailing pond remediation, France

Cofra has installed vertical drains for the remediation of a tailing pond in 2019