Direct naar hoofdinhoud

PVD installation for widening of A2 highway, The Netherlands

With an installation depth up to 10m, we installed in 2003, 7.500.000m1 of prefabricated vertical drain

PVD installation is part of our segment consolidation.

Gerelateerde projecten

P1020271

PVD installation for ENEL powerplant Porto Tolle

With an installation depth up to 25m, we installed in 2003, 700.000m1 of prefabricated vertical drain

Kingston_013

PVD installation for Falmouth Cruise terminal

With an installation depth up to 9.5m, we installed in 2010, 50.000m1 of prefabricated vertical drain

DSC_2939

PVD installation for Mombasa port expansion

With an installation depth up to 32m, we installed in 2013, 5.000.000m1 of prefabricated vertical drain. In 2019 a second phase was executed with 3.300.000m1 of drain

DAN_3886

Offshore PVD installation for Quay 16 extension, Beirut

With an installation depth up to 52m, we installed in 2011, 190.000m1 of prefabricated vertical drain from a barge

P1020271

PVD installation for several projects in Tanjung Pelepas port

With an installation depth up to 34m, cofra singapore installed between 2002 and 2003 on three proejcts in this port, 113.000.000m1 of prefabricated vertical drain

Overview02

PVD installation for Autoroute Tetouan-Fnideq

With an installation depth up to 33m, we installed in 2004, 1.300.000m1 of prefabricated vertical drain.