Direct naar hoofdinhoud

PVD installation for several projects in Tanjung Pelepas port

With an installation depth up to 34m, cofra singapore installed between 2002 and 2003 on three proejcts in this port, 113.000.000m1 of prefabricated vertical drain

PVD installation is part of our segment consolidation.

Gerelateerde projecten

IMG_9645

PVD installation through very dense sand layer Chek Lap Kok Link, Hong Kong

Cofra Singapore installed in 2016 1.600.000m1 drain up to a depth of 45m using our heavy push rig, pushing through the dense sand layer at 20m of depth without predrilling. 

20140917_120602

PVD installation highway widening SAAone A1/A6 Diemen - Almere

With an installation depth up to 7m, we installed in 2016, 7.500.000m1 of prefabricated vertical drains

West_Hythe_7

PVD installation for housing estate West Hythe phase 1-6, UK

Cofra Ltd installed between 2016 and 2019 each year around 400.000 m1 of prefabricated vertical drains

Swindon_G_Park_8

PVD installation for Distribution Plot, Swindon

Cofra ltd installed in 2018, 205.000m1 of prefabricated vertical drains

Tuas1

PVD installation Tuas Finger One reclamation, Singapore

With an installation depth up to 35m, we installed between 2016 and 2019, 5.800.000m1 of prefabricated vertical drains

Pic_014

PVD installation LNG plant Soyo reclamation

With an installation depth up to 25m, we installed in 2008, 2.300.000m1 of prefabricated vertical drains