With an installation depth up to 29m, we installed in 2011, 1.500.000m1 of prefabricated vertical drain.
PVD installation is part of our segment consolidation.
With an installation depth up to 29m, we installed in 2011, 1.500.000m1 of prefabricated vertical drain.
PVD installation is part of our segment consolidation.