Direct naar hoofdinhoud

WE UNLOCK THE POTENTIAL OF UNSUITABLE SOILS

Leading Ground Improvement Experts


Welcome to the homepage of Cofra Ltd.

Cofra Ltd is based near London and executes ground improvement projects in the UK as part of the global operating ground improvement company Cofra BV.

This landing page will provide you with specific information about our branch office and the projects performed in the UK. You can return to this specific home page by clicking the Cofra Ltd link at the bottom of each page.

News and highlights

Felixstowe2_36.JPG

Rapid Impact Compaction by means of CDC

Compaction of old fills, mine dump locations and granular material is performed using our CDC compaction technique.

Read more
Csm 190205 54 79385Cb9e6

Our commitment to safety

Safety is an important factor in Cofra operations. Have a look at our safety section.

Read more
IMG_7687.JPG

Discover our expertise in the field of vertical drainage

Find detailed information about one of our core activities.

Read more
P1040936 Cropped

Vertical Drain installation Cowes harbour

P1020271

Latest Cofra Ltd news item

This will be updated with the latest news item of Cofra ltd.

Read more

Contact our regional representative

Vertegenwoordiging UK

Voor alle vragen, offertes of budget prijzen voor uw project in het Verenigd Koninkrijk

Our UK projects

P1020271

PVD installation for ENEL powerplant Porto Tolle

With an installation depth up to 25m, we installed in 2003, 700.000m1 of prefabricated vertical drain

Kingston_013

PVD installation for Falmouth Cruise terminal

With an installation depth up to 9.5m, we installed in 2010, 50.000m1 of prefabricated vertical drain

DSC_2939

PVD installation for Mombasa port expansion

With an installation depth up to 32m, we installed in 2013, 5.000.000m1 of prefabricated vertical drain. In 2019 a second phase was executed with 3.300.000m1 of drain

DAN_3886

Offshore PVD installation for Quay 16 extension, Beirut

With an installation depth up to 52m, we installed in 2011, 190.000m1 of prefabricated vertical drain from a barge

P1020271

PVD installation for several projects in Tanjung Pelepas port

With an installation depth up to 34m, cofra singapore installed between 2002 and 2003 on three proejcts in this port, 113.000.000m1 of prefabricated vertical drain

Overview02

PVD installation for Autoroute Tetouan-Fnideq

With an installation depth up to 33m, we installed in 2004, 1.300.000m1 of prefabricated vertical drain.