Project
Tyne Capital Dredging
Tyne Capital Dredging The 2011 campaign project, performed by Westminster Dredging, consisted of capital dredging. The River Tyne was dredged from the harbour entrance over a distance of 5.5km to a depth of -10m CD. Furthermore the berth on the south bank (Tyne Bulk Terminal) was dredged... these operations. The dredging campaign was finished on July 26th 2011. Port of Tyne Westminster Dredging Company Ltd