Project
Development gas export pipeline,
Hibiscus to Point Fortin
, directional drilling and onshore pipeline installation and testing of the 24" gas pipeline system. Boskalis' scope of work comprised all dredging... the pig receiver and associated piping at the Atlantic LNG Plant and related supports. The total dredging works consisted of the excavation of a 3,700 m long trench to the -12.0 m LAT contour line. The dredging was carried out by a floating grab dredger, WD Dredgewell, with the assistance of a tug