Project
Heavy lift operations, Rion Antirion bridge
Heavy lift operations, Rion Antirion bridge The Rion Antirion bridge, a 2.3 km long cable stayed bridge, consisting of 4 pylons from which the bridge deck is suspended. SMIT was involved in two phases of the project. During the construction of the pylons, SMIT carried out the management for the tow-out and positioning. For the installation of the steel components SMIT carried out the heavy lift operations. The heavy lift operations