PVD installation for road embankments of Gort - Tuam connection

Cofra Ltd installed 700,000m1 of vertical drains for the Gort Tuam road embankments in 2015.

PVD installation is part of our segment consolidation.

Related projects

P1060324

PVD installation for Westrandweg, Amsterdam

In 2009, we installed 1,300,000m1 of prefabricated vertical drain, with an installation depth up to 14m.

FOTO_S_FRANS_VAN_GERVEN_046

PVD installation for widening of A2 highway, The Netherlands

In 2003, we installed 7,500,000m1 of prefabricated vertical drain, with an installation depth up to 10m.  

20150630_162721

PVD installation for Onne port container terminal

In 2015, we installed 1,400,000m1 of prefabricated vertical drain, with an installation depth up to 30m.

IMGP2732

PVD installation for Brass LNG

In 2008, we installed 900,000m1 of prefabricated vertical drain, with an installation depth up to 45m.

Drammen_1

Offshore PVD installation for Gilhusbukta reclamation Drammen, Norway

In 2018, we installed 650,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 48m.

DSC01104

Offshore PVD installation projects Oslo harbor

We installed PVD on several projects in Oslo harbor, with an installation depth up to 30m, amongst which the opera house. In 2006, a total 65,000m1 of prefabricated vertical drain was installed from a barge.