PVD installation for Daventry Rail freight Terminal

Cofra Ltd installed 155,000m1 of vertical drain on this rail embankment and high bay storage area in 2013.

PVD installation is part of our segment consolidation.

Related projects

P1020271

PVD delivery and installation support for Suncor oil sand tailing pond

Cofra has delivered and installed in joint venture with HB wick drains over 8,000,000m1 PVD for installation in suncor tailing pond number 5.

Bangkok_8

Vacuum consolidation for Suvarnabhumi airport

We installed our BeauDrain-S vacuum consolidation method on an area of 400,000m2 up to a depth of 10m in 2005.

OSTHAFEN_24.2.05_0001

Vacuum consolidation for car terminal Bremerhafen

We installed our BeauDrain-S vacuum consolidation method on an area of 62.000m2 up to a depth of 18m in 2006.

DSCN4513

Vacuum consolidation for housing area

As an example of many project in the Netherlands, we installed our BeauDrain-S vacuum consolidation method on an area of 11,000m2 up to a depth of 11m in 2007 on the Oude Tol project in the Netherlands.

DSCN1653

Vacuum consolidation for bridge approach A12 highway

We installed our BeauDrain-S vacuum consolidation method and BeauDrain vacuum method on an area of 16,000m2 up to a depth of 4,5m in 2008 on this project.

19032011-5K9B5140

Vacuum consolidation for provincial road N207

We installed our BeauDrain-S vacuum consolidation on an area of 25,000m2 up to a depth of 9,0m in 2011.