Cofra Ltd installed 450,000m1 for this road embankment in 2018. PVDÂ installation is part of our segment consolidation. Related projects Filter projects (77) Sort by... Relevance Alphabet Sort by... Relevance Alphabet PVD delivery and installation support for Suncor oil sand tailing pond Cofra has delivered and installed in joint venture with HB wick drains over 8,000,000m1 PVD for installation in suncor tailing pond number 5. Read more Vacuum consolidation for Suvarnabhumi airport We installed our BeauDrain-S vacuum consolidation method on an area of 400,000m2 up to a depth of 10m in 2005. Read more Vacuum consolidation for car terminal Bremerhafen We installed our BeauDrain-S vacuum consolidation method on an area of 62.000m2 up to a depth of 18m in 2006. Read more Vacuum consolidation for housing area As an example of many project in the Netherlands, we installed our BeauDrain-S vacuum consolidation method on an area of 11,000m2 up to a depth of 11m in 2007 on the Oude Tol project in the Netherlands. Read more Vacuum consolidation for bridge approach A12 highway We installed our BeauDrain-S vacuum consolidation method and BeauDrain vacuum method on an area of 16,000m2 up to a depth of 4,5m in 2008 on this project. Read more Vacuum consolidation for provincial road N207 We installed our BeauDrain-S vacuum consolidation on an area of 25,000m2 up to a depth of 9,0m in 2011. Read more Previous 7 8 9 10 11 Next Read more Read more