Direct naar hoofdinhoud

Vacuum consolidation for Suvarnabhumi airport

We installed our BeauDrain-S vacuum consolidation method on an area of 400.000m2 up to a depth of 10m in 2005

Vacuum consolidation is part of our segment consolidation.

Gerelateerde projecten

DSC02160

PVD installation Talinn Harbour extension

With an installation depth up to 28m, we installed in 2004, 500.000m1 of prefabricated vertical drain

IMG_7687

PVD installation for Smince - Jaromer road

With an installation depth up to 15m, Cofra chemia installed in 20018, 350.000m1 of prefabricated vertical drain

P1020271

PVD delivery for DASA factory Hamburg

Cofra delivered 17.500.000m1 PVD on this project

Afbeelding_002

Offshore PVD installation for an harbour Kiel, Germany

With an installation depth up to 25m, we installed in 2007, 172.000m1 of prefabricated vertical drain in offshore conditions

P1020271

PVD installation for Harbour extension Semsamar Guadeloupe

With an installation depth up to 19m, we installed in 2013, 31.000m1 of prefabricated vertical drain

P1020271

PVD installation for waste water treatment plant Conackry

With an installation depth up to 11m, we installed in 2004, 95.000m1 of prefabricated vertical drain