Direct naar hoofdinhoud

Vacuum consolidation for car terminal Bremerhafen

  We installed our BeauDrain-S vacuum consolidation method on an area of 62.000m2 up to a depth of 18m in 2006

Vacuum consolidation is part of our segment consolidation.

Gerelateerde projecten

IMG_0974

PVD installation for PSA terminal expansion in Panama

With an installation depth up to 12m, we installed in 2015, 1.400.000m1 of prefabricated vertical drain

IMG-20140605-WA005

PVD installation for Ostrow Brdowski island

With an installation depth up to 11m, we installed in 2013, 185.000m1 of prefabricated vertical drain

DSC01840

PVD installation for auto-estrada do Norte

With an installation depth up to 29m, we installed in 2011, 1.500.000m1 of prefabricated vertical drain.

IMG_0058

PVD installation for world cup stadium St. Petersburg

With an installation depth up to 18m, we installed in 2016, 1.800.000m1 of prefabricated vertical drain

IMG_0027

PVD installation for world cup stadium Kaliningrad

With an installation depth up to 18m, we installed in 2009, 2.500.000m1 of prefabricated vertical drain

IMG_0673

PVD installation for port of Barcelona

With an installation depth up to 30m, we installed in 2010, 900.000m1 of prefabricated vertical drain