Direct naar hoofdinhoud

PVD installation Tuas Finger One reclamation, Singapore

With an installation depth up to 35m, we installed between 2016 and 2019, 5.800.000m1 of prefabricated vertical drains

PVD installation is part of our segment consolidation.