Direct naar hoofdinhoud

PVD installation for reclamation Centerpoint Makassar

With an installation depth up to 25m, we installed in 2017, 7.000.000m1 of prefabricated vertical drains

PVD installation is part of our segment consolidation.

Gerelateerde projecten

IMG_0974

PVD installation for PSA terminal expansion in Panama

With an installation depth up to 12m, we installed in 2015, 1.400.000m1 of prefabricated vertical drain

IMG-20140605-WA005

PVD installation for Ostrow Brdowski island

With an installation depth up to 11m, we installed in 2013, 185.000m1 of prefabricated vertical drain

DSC01840

PVD installation for auto-estrada do Norte

With an installation depth up to 29m, we installed in 2011, 1.500.000m1 of prefabricated vertical drain.

IMG_0058

PVD installation for world cup stadium St. Petersburg

With an installation depth up to 18m, we installed in 2016, 1.800.000m1 of prefabricated vertical drain

IMG_0027

PVD installation for world cup stadium Kaliningrad

With an installation depth up to 18m, we installed in 2009, 2.500.000m1 of prefabricated vertical drain

IMG_0673

PVD installation for port of Barcelona

With an installation depth up to 30m, we installed in 2010, 900.000m1 of prefabricated vertical drain