Direct naar hoofdinhoud

PVD delivery for Osaka Airport

Cofra and Geotechnics have delivered 1.200.000m1 PVD for the Osaka aiport expansion project in 1992

  

Gerelateerde projecten

IMG_3400

PVD installation airport construction Changi East, Singapore

With an installation depth up to 60m, we are installing, 42.000.000m1 of prefabricated vertical drains

DJI_0082

PVD installation Matarbari USCC Power Plant Project, Bangladesh

With an installation depth up to 25m, we installed in 2018 and 2019 over 10.000.000m1 of prefabricated vertical drains

Makassar_13

PVD installation for reclamation Centerpoint Makassar

With an installation depth up to 25m, we installed in 2017, 7.000.000m1 of prefabricated vertical drains

IMG_8232

PVD installation new Mexico City airport runway 3

With an installation depth up to 20m, we installed in 2017, 27.800.000m1 of prefabricated vertical drains

bouyguesTP-PortBrest-M02-P1-2515_original

Offshore PVD installation M02 basin enclosure Port de Brest, France

With an installation depth up to 17 below seabed, we installed in 2018, 415.000m1 of prefabricated vertical drains from a barge

DSC_1084

PVD installation N23 provincial road widening The Netherlands

With an installation depth up to 12m, we installed between 2015-2016, 11.300.000m1 of prefabricated vertical drains