Direct naar hoofdinhoud

PVD installation for Belfast Docks, Northern Ireland

Cofra Ltd installed 200.000m1 of vertical drain on this new dock extension/devlopment works in 2011 

PVD installation is part of our segment consolidation.

Gerelateerde projecten

P1070065

Vacuum consolidation for Eastern Access Route IJburg (OOIJ), Amsterdam

We installed our BeauDrain and BeauDrain-S vacuum consolidation methods on an area of 50.000m2 up to a depth of 7.0m in 2012 on this project

P1060456

Vacuum consolidation trial Tuas view A3A, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 5.000m2 up to a depth of 24m in 2010 on this project to investigate the depth effect of the vacuum system.

International_cruise_terminal_singapore_7

Vacuum consolidation for the international cruise terminal, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 6.000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles 

Markermeerdijken_6

Vacuum consolidation trial Markermeerdijken

We installed our BeauDrain-S vacuum consolidation method and Liner vacuum method on an area of 450m2 up to a depth of 7m in 2016

IMG_3909

PVD installation for Treasure Island, San Francisco

Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands

IMG_0883

BeauDrain-S installation for dike reinforcement project Hoekse Waard Noord

We installed BeauDrain-S drains without vacuum preloading for draining a specific layer for a dike reinforcement project in The Netherlands.