PVD delivery and installation support for Suncor oil sand tailing pond

Cofra has delivered and installed in joint venture with HB wick drains over 8.000.000m1 PVD for installation in suncor tailing pond number 5 

PVD installation is part of our segment consolidation

Gerelateerde projecten

IMG1263

PVD installation for landing strip Malaga airport

With an installation depth up to 30m, we installed in 2009, 2.000.000m1 of prefabricated vertical drain

P1020271

PVD installation for road embankment Paramaribo

With an installation depth up to 20m, we installed in 2009, 300.000m1 of prefabricated vertical drain.

P1080758

PVD installation for new Istanbul Airport project

With an installation depth up to 17m, we installed in 2015, 575.000m1 of prefabricated vertical drain

P1020271

PVD installation for Bombay port India

 We installed 2.000.000m1 of prefabricated vertical drain in 1986 on this project

P1020271

PVD installation for channel tunnel

We installed 2.200.000m1 of prefabricated vertical drain in 1988 on this project

P1020271

PVD delivery for Osaka Airport

Cofra and Geotechnics have delivered 1.200.000m1 PVD for the Osaka aiport expansion project in 1992